On May 23, 2018, we published revised versions of our Privacy Policy and User Agreements. Please read these updated terms and take some time to understand them. Your use of our services is subject to these revised terms.
Yes, I Agree.

Pan Global Corp. (PGLO) Begins Integrating First Renewable Energy Source into India’s Emerging Electrical Power Market

Pan Global Corporation, a renewable energy technology and infrastructure company, recently announced that its first acquisition candidate, the Project Badyar small hydro-electric station, is nearly a month away from completion of construction. This will be the first of many projects that will allow Pan Global to participate in India’s strong demand for renewable energy technologies.

Project Badyar is based in the state of Uttarakhand, in which over the past decade alone, demand for electric power consumption increased by over five times. About 30% of that demand is due to the consumer sector and experiencing growth due to a rising middle class, but over 40% of that demand is from industry. If you look at that state in the early 2000’s, over 40% of the population was primarily working poor, mainly in the agricultural sector. However, Uttarakhand always had a very high literacy rate in excess of 76% of the population. So, combine low-cost, highly literate labor with attractive tax incentives offered through the State Industrial Development Corporation of Uttarakhand Limited, and the result is explosive industrial growth. Some incentives structured were on the level of 100% income tax exemption for the first five years, and 30% the next five, and so forth. In no time, sugar cane and rice paddy fields gave way to industrial parks and prefabricated buildings, and manufacturers such as Tata Motors, Bajaj Auto, Nestle, Hewlett-Packard, and many others began to dominate the plains areas of Uttarkhand.

Uttarkhand is also a state that suffered from the ravages of climate change-enhanced extreme weather phenomena. In June of last year, the area experienced a rainfall that was heavier by 375% above the benchmark of an average monsoon season. Combined with accelerated glacial melt, this led to the worse flashflood in 90 years, leading to washed-out roads and bridges, major mudslides, and presumably 5,700 people dead. Environmentalists blamed the national road building program which led to routes constructed in remote areas without any adequate drainage. Many more environmentalists also blamed the rash construction of very large scale hydro-electric projects that involved building major dams as contributing to the disaster by weakening river banks. Large scale hydroelectric power stations typically involve building a dam which interrupts the flow of a river and can cause significant harm to a local ecosystem, and often displace people and wildlife. Small hydroelectric power plants on the other hand have a very low environmental impact and are ideal for small communities. This is one of the reasons why the Alliance for Rural Electrification expects the small hydro-electric market, meaning power stations that produce less than 10 Megawatts, to grow from a $14 billion market back in 2008 to a $38.5 billion market by 2015.

Uttarkhand is itself divided up into 13 districts. Project Badyar is located in the northern most district of Uttarkashi among the foothills of the Himalayan mountain range. There is little manufacturing industry in this district, but as both the Ganges and Yamuna rivers originate in this district, tourism and resorts are a major contributor to the local economy as well as agriculture and forest products. The region has a population over 329,000 putting it on par with the population of the Central American nation, Belize. The annual power output of Project Badyar is expected to be about 27,500 Megawatt hours, which is enough to power 100,000 Indian households in that region.

Not using a large dam to create a massive reservoir of water, water is collected at Project Badyar using what is called a trench weir. Essentially a trench is built across a stream effectively below the bed level of the stream so as not to cause any major obstructions that can impact the ecosystem. The top of the weir is covered with bottom rack bars. Water while flowing over it, passes through the bottom racks and enters into the trench and collected in an intake well located at one of the banks at the end of the weir. The bottom racks consists of heavy rounded steel bars placed parallel to the river flow and prevent heavy boulders and pebbles from entering into the water to be channeled to the power station.

The water then flows into a large desilting tank which basically just uses gravity to let the heavier sediment fall out of the water, otherwise abrasive material in the water would quickly wear out the turbine blades which are rotated to generate power. The water is transported to the power station among a system of pipes referred to as the conveyance line, and is laid out among the contours of the mountains such as not to disturb the local landscape. The water then flows into a sizable forebay tank which regulates the flow before entering a narrower line of piping referred to as the penstock which is placed at a very steep angle to increase water velocity and pressure before hitting turbines in the powerhouse of the electric generation station. Upon leaving the powerhouse, the water is returned to the river via an artificially built canal like structure known as a tail race. As the water is used and not consumed, you have a truly renewable energy source.

Hilly areas like those in Uttarkashi where you have streams of water rushing down narrow steep-sided valleys are ideal for what are referred to as ‘run of river’ type of small scale hydro-electric plants and are the least environmentally damaging. The power generated is expected to go to a local switchyard to a nearby substation and then into the local grid.

Pan Global Corporation also plans to enter the geothermal energy market as well as the solar power markets in India. Over two-thirds of India’s power comes from burning coal, and although India has a large coal mining industry, they only meet 72% of their coal needs, meaning the rest has to be imported from Australia and Indonesia. This has resulted in coal prices tripling over the past three years. On top of that, the heavy usage of fossil fuels has managed to put India on par with China in terms of having the world’s worse air quality. Combine those facts with the need to cut the carbon foot print to attempt to mitigate global warming/climate change, has motivated India’s Prime Minister Manmohan Singh to set aggressive targets to shift off of fossil fuels and to up the country’s target of photovoltaic electricity production capacity by 30% for 2014. Pan Global is definitely in the right place at the right time.

For more information on the company, visit www.panglobalcorp.com

Let us hear your thoughts: Pan Global Corp. Message Board

Archives

Select A Month
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • October 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • January 2019
  • December 2018
  • November 2018
  • October 2018
  • September 2018
  • August 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • November 2017
  • October 2017
  • September 2017
  • August 2017
  • July 2017
  • June 2017
  • May 2017
  • April 2017
  • March 2017
  • February 2017
  • January 2017
  • December 2016
  • November 2016
  • October 2016
  • September 2016
  • August 2016
  • July 2016
  • June 2016
  • May 2016
  • April 2016
  • March 2016
  • February 2016
  • January 2016
  • December 2015
  • November 2015
  • October 2015
  • September 2015
  • August 2015
  • July 2015
  • June 2015
  • May 2015
  • April 2015
  • March 2015
  • February 2015
  • January 2015
  • December 2014
  • November 2014
  • October 2014
  • September 2014
  • August 2014
  • July 2014
  • June 2014
  • May 2014
  • April 2014
  • March 2014
  • February 2014
  • January 2014
  • December 2013
  • November 2013
  • October 2013
  • September 2013
  • August 2013
  • July 2013
  • June 2013
  • May 2013
  • April 2013
  • March 2013
  • February 2013
  • January 2013
  • December 2012
  • November 2012
  • October 2012
  • September 2012
  • August 2012
  • July 2012
  • June 2012
  • May 2012
  • April 2012
  • March 2012
  • February 2012
  • January 2012
  • December 2011
  • November 2011
  • October 2011
  • September 2011
  • August 2011
  • July 2011
  • June 2011
  • May 2011
  • April 2011
  • March 2011
  • February 2011
  • January 2011
  • December 2010
  • November 2010
  • October 2010
  • September 2010
  • August 2010
  • July 2010
  • June 2010
  • May 2010
  • April 2010
  • March 2010
  • February 2010
  • January 2010
  • December 2009
  • November 2009
  • October 2009
  • September 2009
  • August 2009
  • July 2009
  • June 2009
  • May 2009
  • April 2009
  • March 2009
  • February 2009
  • January 2009
  • December 2008
  • November 2008
  • October 2008
  • September 2008
  • August 2008
  • July 2008
  • June 2008
  • May 2008
  • April 2008
  • March 2008
  • February 2008
  • January 2008
  • December 2007
  • November 2007
  • October 2007
  • September 2007
  • August 2007
  • July 2007
  • June 2007
  • May 2007
  • April 2007
  • March 2007
  • February 2007
  • January 2007
  • December 2006
  • November 2006
  • October 2006
  • September 2006
  • August 2006
  • July 2006
  • June 2006
  • May 2006
  • April 2006
  • March 2006
  • January 2006
  • December 2005
  • October 2005
  • September 2005
  • Market Basics

    New to the micro-cap markets?Get answers to your questions about investing in Small-Cap / Micro-Cap Stocks and learn how to protect yourself.

    The Basics

    Newsletter Publishers

    Have an up and coming newsletter and want to be included in our coverage list? Looking to get more coverage and grow subscriptions? Register for coverage.

    Register

    Public Companies

    Are you a Small-Cap / Micro-Cap company looking for coverage? We'd love to hear from you. Fill out our quick contact form or send us a text.

    Get Covered